High-strength snap tie systems trusted by UK construction professionals for stable, precise concrete forming. Nationwide delivery.
Browse Our ProductsA snap tie system is a proven method for holding concrete form panels securely in position while concrete is poured and cures. The system uses a series of interlocking components — ties, brackets, wedges, and clamps — that work together to maintain consistent wall thickness, prevent panel movement, and deliver a clean, professional finish.
Whether you’re forming a residential basement wall or a large commercial structure, the snap tie system gives you the stability and accuracy you need at every stage of the pour.
The backbone of the system. Available in short end (for closer panels) and long end (for wider panels) variants, with a safe working load of 1,020 kg.
Prevents concrete from seeping into the tie hole, leaving a clean, smooth surface finish once the forms are stripped.
Distributes the load across the form panel, preventing the tie from pulling through and adding an extra layer of stability.
Jahn A brackets secure horizontal walers; Jahn C brackets secure vertical walers. Together they keep forms perfectly aligned during the pour.
Hammered over the snap tie ends to lock them firmly in place, preventing any movement during the pour and ensuring consistent wall thickness.
Also known as a concrete turnbuckle, this adjustable brace fine-tunes panel alignment to ensure a level, plumb wall before pouring begins.
A single-unit clamp that wraps around the waler and secures it to the form panel, maintaining alignment and stability throughout the pour.
Supports two horizontal walers on each side of the panel, distributing concrete pressure evenly and preventing bulging in taller or larger walls.
Position the form panels to your desired dimensions, ensuring they are aligned and properly supported before inserting any ties.
Thread the appropriate snap ties through the panel holes — short end for closer panels, long end for wider walls. Attach plastic cones or washers as required.
Clamp Jahn A brackets onto the snap ties to secure horizontal walers. Use Jahn C brackets for vertical walers to maintain plumb alignment.
Hammer snap tie wedges over the tie ends to lock everything in place. Use form aligner braces to fine-tune level and plumb before pouring.
Fit one-piece waler clamps and double waler brackets at regular intervals. Conduct a final inspection, then pour and monitor the concrete throughout.
Allow the concrete to cure fully. Remove the formwork carefully — snap ties with plastic cones leave a clean, professional hole finish in the wall face.
Safe Working Load
1,020kg
per snap tie
Available Wall Sizes
152mm to 1,219mm
6″ to 48″
Can't find what you're looking for? Send us a message and we'll get back to you.
Browse our full range of snap ties, Jahn brackets, wedges, waler clamps and formwork accessories — volume pricing available, with nationwide UK delivery.
Shop Now